Export Flight Readiness Control Tower

Historical operational replay

Real source records only

When risk first became visible

Earliest breached core MCT checkpoint in the filtered flights.

Where the bottleneck sits

Primary process signal based on event sequence; cause codes are not available.

Flights requiring attention

Click any row for the complete flight → ULD → AWB evidence trail.

RiskFlightScheduledAirline / typeRisk first visibleBottleneckFBL · RCS · Build · UWSLoadDeparture outcome

Recurring risk by airline

Operating airline is the default. Main carrier can be selected where the source distinguishes the two.

Airline performance detail

Click a row to return to the risk board filtered to that airline.

AirlineFlightsUWS breachBuild issueRCS issueMedian dep. delayWeight on UWS-late flights

Cargo destinations with recurring exposure

These are AWB cargo destinations, not aircraft sector endpoints.

DestinationFlights carrying cargoAWBsChargeable weightWeight on UWS-late flightsLate RCS AWBs

Measured process chain

Counts are flight-level unless stated otherwise; filtered scope applies.

How late UWS presents

Separates upstream build/acceptance signals from inferred flight-close handoff cases.

UWS timing vs departure outcome

Each point is a real flight. Association is shown; no delay-reason codes exist to prove causation.

CargoPassenger

Flights with the strongest measured readiness chain

Sorted by late UWS, upstream breaches, cargo weight and actual departure impact.

FlightAirlineEvidence chainLate Build/Bulk ULDsLate RCS AWBsUWS deltaDeparture delayWeight

Data coverage

What is directly available in the supplied files.

Known data gaps

These prevent a complete operational cause model.

FOW is the largest process blind spot. The MCT requires Freight Out of Warehouse at D-2h, but no direct FOW timestamp exists in the master table.
Flight route endpoint
Not present. “Destination” is the AWB cargo destination and a single flight may carry cargo for many destinations.
90% general acceptance
No direct event exists. The cockpit shows a clearly labelled proxy using manifested pieces and last-piece-received timestamps.
Delay reason / root-cause code
Not present. “Flight-close handoff” is an inference only when UWS is late and all measurable upstream core milestones are on time.
Resources and locations
No staffing, forklift, build-station, dolly, VOP, loading-start or live ULD-location data is supplied.
Live status
The files are historical. A production cockpit would require event streaming or frequent refresh.

Applied MCT rules

Targets are taken directly from the supplied Export Cargo Flow MCT pages.

MilestoneFreighter / CargoPassengerHow used

Data quality signals

Visible as review flags; records are not silently deleted.

Interpretation guardrails

Risk state
Rule-based against core milestones: Final FBL, RCS, Build (Build/Bulk only), and UWS. It is not a trained prediction model.
Recovered
An upstream core milestone was late or missing, but UWS was on time.
Critical
UWS was late or missing at the flight-close checkpoint.
Actual departure
The outbound master field “Flight.ATA” is treated as actual departure because it exactly matches “ATA/ATD” on every matched non-null export row.
Volume matching
Flight numbers were normalized only for leading zeros (for example 6E-022 to 6E-22). All shared-period export rows matched after this normalization.
Scope
Export Cargo/Freighter and Passenger flights only. Truck, Transit out and Transfer out are excluded because the supplied MCT does not define their rules.